Construction Details
Water Meter Installation
Off Road Single Service Meter Pit Nonload Rated
Above Grade Fire & Domestic Installation
Above Ground Backflow Chamber
Deduct Meter Installation Homeowners Responsibility
Trench Installation in Rock and Soil
Service Connection
Service Connection Greater than 4 Inches
Concrete Collar
Permanent Blowoff Assembly
Automatic Air Release Manhole
Hydrant
Tapping Sleeve and Valve
Temporary Flushing Connection
Temporary Flushing Connection on Dead End Water Main
Water Main Horizontal or Vertical Relocation
Utility Separation
Water Service within 25’ of Contamination Source
Connection of New Water Main to Existing Water Main
Temporary Connection for Pressure Testing and Disinfection
Thrust Block
Restrained Pipe Lengths
As-Built Example for Water Mains
As-Built Example for Water Service
Related Topics
Key Topics
Emergency Info
Learning Center
Contact Information
Hours: Mon-Fri, 8am to 4pm
Phone: (401) 821-9300
Fax: (401) 823-4810
Email Customer Service
35 Technology Way
West Greenwich, RI 02817
Directions
Water Notifications
Sign-up to receive water notifications through SmartNotice
News
View recent news from the Kent County Water Authority
Cross Connection & Backflow Information
Learn about cross connections and back flow prevention and testing services
Conservation & Water Savings
Water conservation tips and advice