Technical Reports
Below you will find the available Technical Reports. Click on the corresponding link for a given report to download the file.
Kent County Water Authority Clean Water Infrastructure Replacement Plan Update 2019
2014 Hydraulic Model Update Report
2014 Hydraulic Model Update Report Appendix
2014 Tank Study Update Report
New Office & Facility Report
Water Supply System, Five Year Capital Improvement Program Update (2017 - 2022)
Clean Water Infrastructure Replacement Plan Update, February 2009
Distribution Storage Tank Hydraulic Evaluation for Available Fire Flow Analysis of Future Conditions (Revised December 2007)
Distribution Storage Tank Hydraulic Evaluation for Storage Facility Analysis - Future Demand Conditions (Revised July and August 2007)
Distribution Storage Tank Hydraulic Evaluation for Available Fire Flow Analysis (Revised July 2007)
Distribution Storage Tank Hydraulic Evaluation for Existing and Future System Demands (Revised June and July 2007)
Distribution Storage Tank Hydraulic Evaluation for Existing and Future System Demands
Distribution Storage Tank Hydraulic Evaluation for Existing and Future System Demands
Distribution Storage Tank Hydraulic Evaluation for Existing Water Storage Facilities.
This evaluation is intended to consider system demand for both existing and the projected planning period and an evaluation of the ability of the water system infrastructure distribution storage components to effectively meet these demands.
This project relates to utilizing the updated computerized hydraulic model of the Kent County Water Authority (Authority) water system to complete a detailed hydraulic study and evaluation of the entire supply and distribution system for the next twenty (20) year planning period.
Hydraulic Model Update Report for February 2006
Hydraulic Model Update Report for June2004
  Contact Information

Hours: Mon-Fri, 8am to 4pm
  Phone: (401) 821-9300
  Fax: (401) 823-4810
  Email Customer Service

1072 Main Street
PO Box 192
West Warwick, RI 02893-0192
  Directions